Check Ground Conditions
Clean: Make sure the ground is clean and free of dust and debris.
Level: Use a level to check for flatness. Fix any uneven areas.
Adapt to Environment
Temperature and Humidity: Keep the installation area between 18°C and 30°C (64°F to 86°F) with 35% to 65% humidity.
Acclimation: Let the LVT flooring sit in the room for 48 hours before installation.
Subfloor Preparation
Check Subfloor: Ensure the subfloor is suitable (concrete, wood, tile) and choose the right installation method.
Repair: Fix any cracks or uneven spots on the subfloor.
4. Check Tools and Materials
5. Design Plan: Create a layout plan considering the flooring pattern and direction.
Leave Gaps: Leave a small gap (5-10 mm) between the walls and the flooring.
6. Inspect Flooring Materials