News

Home / News / Industry News / What needs to be done before installing LVT flooring?

What needs to be done before installing LVT flooring?

Nov 25,20241
What needs to be done before installing LVT flooring?
Lvt flooring 

    Check Ground Conditions

    Clean: Make sure the ground is clean and free of dust and debris.

    Level: Use a level to check for flatness. Fix any uneven areas.

     

    Adapt to Environment

    Temperature and Humidity: Keep the installation area between 18°C and 30°C (64°F to 86°F) with 35% to 65% humidity.

    Acclimation: Let the LVT flooring sit in the room for 48 hours before installation.

     

    Subfloor Preparation

    Check Subfloor: Ensure the subfloor is suitable (concrete, wood, tile) and choose the right installation method.

    Repair: Fix any cracks or uneven spots on the subfloor.

     

    4. Check Tools and Materials

     

    5. Design Plan: Create a layout plan considering the flooring pattern and direction.

    Leave Gaps: Leave a small gap (5-10 mm) between the walls and the flooring.

     

    6. Inspect Flooring Materials